Specialist in Barge Ballasting Works

Barge Ballast/Deballasting Work in Indonesia

We provide our own equipment for barge ballast/de-ballasting work to keep the barge even keel (list and trim) to the jetty. We have our portable generator to power our submersible pumps (Output/Input Capasity at 100 cu.meter per hour) and the electric power distribution control panel to on and off the pumps during ballasting work. It is suitable for operation 24 hours and barge size up to 330 feet size.

Crane Offloading

This is sample of our work scope to offloading 650 Ton Crane from Barge Rail to Dolphin and Jetty Rail. We have to maintain the barge list and trip even the tide table is up and down shall cover for 24 hour operation

Ballasting Barge

Leveling the barge with heavy cargo for loadout or offload work sometimes need maximum requirement, for example we have to keep the barge level with jetty maximum 20mm, then we have to ballast the barge as per requirements. 

Leveling Barge

Barge level, jetty elevation, tide table, wind speed & direction, mooring points, bathymetric table, barge hydrostatis table, pump capacity, loadout or offloading sequence and duration will be the aspects for leveling the barge.

Engineering

Engineering is needed to calculate water for barge ballasting, operation duration, stability of barge,  intact & damage analysis, local strength checks,  and other requirement needed by client as well as mooring analysis. We can provide all the calculations.

A title

Lorem ipsum dolor sit amet, consectetur adipisici elit,
sed eiusmod tempor incidunt ut labore et dolore magna aliqua.
Ut enim ad minim veniam, quis nostrud

A title

Lorem ipsum dolor sit amet, consectetur adipisici elit,
sed eiusmod tempor incidunt ut labore et dolore magna aliqua.
Ut enim ad minim veniam, quis nostrud